|
Last Modified: 11-29-2007 |
1.6 A |
|
Service Category: Power Source/Network |
Section: Battery/Charging |
|
Model Year: 2008 |
Model: Sequoia |
Doc ID: RM000002BS200OX |
|
Title: 3UR-FE BATTERY / CHARGING: GENERATOR: INSTALLATION (2008 Sequoia) |
INSTALLATION
1. INSTALL GENERATOR ASSEMBLY (for 130 A, 150 A Type)
|
(a) Install the generator with the 3 bolts and nut.
Torque: 43 N·m (438 kgf·cm, 32 ft·lbf)
|
|
(b) Connect the generator connector.
|
(c) Connect the generator wire with the nut.
Torque: 9.8 N·m (100 kgf·cm, 87 in·lbf)
(d) Install the terminal cap.
(e) Install the harness bracket to the generator with the bolt.
Torque: 31 N·m (316 kgf·cm, 23 ft·lbf)
2. INSTALL GENERATOR ASSEMBLY (for 180 A Type)
|
(a) Install the generator with the 3 bolts and nut.
Torque: 43 N·m (438 kgf·cm, 32 ft·lbf)
|
|
(b) Connect the generator connector.
|
(c) Connect the generator wire with the nut.
Torque: 12 N·m (122 kgf·cm, 9 ft·lbf)
(d) Install the terminal cap.
(e) Install the harness bracket to the generator with the bolt.
Torque: 31 N·m (316 kgf·cm, 23 ft·lbf)
3. CONNECT VANE PUMP ASSEMBLY
HINT:
Before performing the following procedures, move the spacer until the vane pump can be installed.
|
(a) Install the vane pump to the timing chain cover with the 2 bolts.
Torque: 28 N·m (286 kgf·cm, 21 ft·lbf)
|
|
(b) Connect the clamp and 2 power steering connectors.
|
4. INSTALL FRONT FENDER APRON SEAL RH
5. INSTALL FAN SHROUD (w/ Trailer Towing System)
6. INSTALL FAN SHROUD (w/o Trailer Towing System)
7. CONNECT OUTLET RADIATOR HOSE
8. INSTALL INLET RADIATOR HOSE
9. ADD ENGINE COOLANT
10. INSPECT FOR COOLANT LEAK
11. INSTALL V-BANK COVER SUB-ASSEMBLY
12. INSTALL NO. 1 ENGINE UNDER COVER
13. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 5.4 N·m (55 kgf·cm, 48 in·lbf)
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected
.
|